A commitment to excellence was made priority in this project by the owner and was carried out by the construction team. The owner’s vision was 100% employee comfort and overall energy efficiency. Through a detailed design and a thorough construction team the owner experienced immediate return on their investment with low employee turnover and efficient power bills. It is rewarding to an owner and contractor when a quality product is constructed under a complex schedule all while the visions of the project are embraced and delivered. This project required contractors who understood the owner’s vision and an atmosphere where teamwork between all parties could work towards the ultimate goal. A complete success story for all involved is why we think a National ABC Eagle award is the final compliment to the team’s determination and commitment.
Located adjacent to the existing National Naval Aviation Museum, the National Flight Academy is a 102,000 sq. ft. four-story structure designed to be fully and intensively immersive. Also located adjacent to the existing National Naval Aviation Museum, the Hanger Exhibition Hall is a 55,000 sq. ft. museum exhibit hanger. Comfort Systems is proud to have been selected to provide new mechanical systems for both buildings.
The Sacred Heart Hospital on the Emerald Coast wanted to lower the temperature and humidity levels in their operating rooms. However, it was very important that the operating room schedule not be affected. Comfort Systems USA Southeast was more than happy to help. Comfort Systems USA provided project development services including system selection, construction sequencing, temporary cooling/dehumidification and budget pricing. Comfort Systems USA established a Gross Maximum Price arrangement where 100% of the savings was returned to the owner upon completion.
Read more: Sacred Heart Hospital Emerald Coast Operating Room Upgrades
The Naval Air Station Hospital in Pensacola Florida contracted Comfort Systems USA Southeast to perform repairs and rennovations to the 3rd, 4th, and 5th floors of the building. During construction, the medical facility was occupied and fully functional. The work was done in two phases. Phase 1 consisted of the partial renovation of the 3rd floor and complete renovation of 5th floor. Phase 2 consisted of the complete renovation of the 4th floor and penthouse.
Tallahassee Memorial’s new outpatient Cancer Center will be home to all of TMH’s outpatient clinical cancer services including one of the most advanced linear accelerators in the world. The Tallahassee Memorial Cancer Center at One Healing Place is a 52,412 square-foot building featuring comfortable furnishings, patient-centered amenities and a beautiful, outdoor Healing Garden. The new cancer center is Green in more ways than just the Healing Garden. It was decided that the building needed to be LEED certified and Comfort Systems USA Southeast is proud to be a partner with TMH in this endeavor. Please see below for project details.
When the Armor Brigade from Fort Knox relocated to Fort Benning in 2010, they required new facilities equipped to handle their needs. Comfort Systems USA Southeast assisted in the design of the facility and worked with Tetra Tech Facilities Construction and our sister company Capital Refrigeration to ensure that all of the Armor Brigade’s needs were met in a timely fashion. We are very proud to have played a key role in this project. This project is LEED Silver and had an aggressive schedule allowing only 16 months for completion of the entire project. Please see below for project details.
When Buckeye Technologies chose a partner to maintain the air system and chillers at their paper mill in Perry, FL, they selected Comfort Systems USA (Southeast).
The Navy Federal Credit Union (NFCU) needed to expand their call center operations with a primary objective to reduce the 60% annual turnover rate for telephone operators. NCFU came up with the simple philosophy: Healthy employees equal healthy business, and therefore decided to create a "green" environment using construction practices to achieve LEED Gold certification.